Solar power Anti Islanding The cost ??

Hello all   G99  etc consumer advice  What are the standby running costs to monitor grid fail and and eventual inverter physical separation ?  Anyone know ? 

Q: How is physical separation achieved for islanding protection when grid is detected as down ?  There is much tech mumbo jumbo " phase detection " zero crossover " but no genuine answer as to what the standby costs of running all this this actually is 

Appears ( however fail is detected ) final physical separation is achieved by a plain old electro mechanical contactor ?  It is simply de-energised  Contacts separate and we are done ? 

Could it be that these power  devices are maintained energised all year 24/7 consuming power until here is an issue ? 

If so can the solar grid tie industry tell us what power is consumed in this effort and where does it come from ? 

ciao Ms Otis 

  • Not sure about G99, but my older (and simpler) G83 PV inverter certainly does clunk as it connects/disconnects - so mechanical contactor seems a good guess. To connect not only does the mains have to be present, but the PV side providing power as well - so I suspect most of the power needed comes from the local generator. Whole site G99 systems might be different though.

    A while ago I did worry the night-time consumption during the hours of darkness (one of those simple clip on energy monitors suggested it was in the 10s of Watts) - but later measurements with proper Watt Hour meters confirmed the manufacturer's figures were about right (I don't recall the exact numbers off hand, but I'm pretty sure it wasn't more than 1W).

    All in all it's probably very small amounts - like tariff meters.

        - Andy.