I wonder how they know that they have NOT let any air into the pipes? (Other than there being no BANG!)
Clive
The introduction of a LITTLE air is of no consequence, provided that the resultant mixture is well above the upper explosive limit.
lyledunn:
Sparkingchip:
Why do you think the minimum ceiling height for habitable rooms was removed from the Building Regulations allowing cellars and lofts with low ceilings to be turned into habitable rooms, particularly in student and other HMOs?
Andy B.Yes but 5.16 of ADB requires minimum of 2m for escape route
AncientMariner:
I wonder how they know that they have NOT let any air into the pipes? (Other than there being no BANG!)
Clive
Sparkingchip:
Why do you think the minimum ceiling height for habitable rooms was removed from the Building Regulations allowing cellars and lofts with low ceilings to be turned into habitable rooms, particularly in student and other HMOs?
Andy B.
Alan Capon:
Air in the system is only part of it. One of the risks is an appliance without a “flame failure device” fitted on either a burner or a pilot light, and the liability involved with unintentionally filling a property with unburnt gas. Each property has to be visited and the main gas valve secured in the “off” position. Only then can gas be re-introduced into the pipe network. Once the mains have been filled and purged with air, each property needs visiting again, to turn the main valve back on and complete safety checks.