Changing MCBs to RCBOs is it notifiable under part P

Now retired I am no longer a member of a competent persons scream, I was full scope member of NICEIC, 2391 qualified etc;   I can still hold a screw driver and press the buttons on my MFT when I can remember where I put them down.  

In the lovely house we built to retire in the 21 way consumer unit is full,  having had a lot of twinkly LEDs wiped out in the recent thunder storm , I think urge protection would be a good idea.

In order to free up the slots occupied by two RCDs and have space for the urge protector by simply changing the MCBs to RCBOs.  Is this notifiable under part P.

 I have done some other recent electrical changes and our local building control who are absolutely super relieved me of around £100 for the pleasure of fitting some 16A industrial sockets in my workshop because the work was indeed notifiable.    I would prefer not to have to pay another £100. 

  

  • Regarding sockets. If you have an existing socket circuit A then add some more sockets B then remove sockets A then it is not notifiable. but if you first remove A then add B it is notifiable. Just a thought LOL. 

    I don't think so 'cos the wires are still the same ones.

  • Sorry Chris, I did not explain properly.

    If you have say a bog standard radial (in red/black T & E if you like) and at the circuit origin add a new radial (in Brown/blue T & E). Then remove the red/black radial and you have complied with part p and not notified. But if you remove the red/black radial then add the brown/blue radial it becomes a new circuit therefore notifiable. Daft innit?

  • I don't think removing the old cabling first then adding the new becomes notifiable. You're not adding a new circuit: an OCPD isn't being added or modified. The regulations are there to ensure that minor works can be done while ensuring that major works are done by someone skilled, or failing that check out by someone skilled. There's always going to be a grey area between the two, as the distinction is fairly artificial. (Is adding a spurred socket using 1.0 T&E any more/less safe than say adding a new B32 to the CU and connecting a ring to it using 1.0 T&E for example).