Good afternoon,

I have an installation of a 6mm SWA cable, for a supply to a domestic EV charger. The route is obstructed by front of house, brick built access steps, with a concrete slab top, and the preferred route is to pass under/through the steps, which are 900mm wide, this would require drilling a hole in either side of the bricks which form the steps. The regs state no specific depth, just sufficient to avoid damage. As there is almost zero chance of any mechanical damage, and the rest of the cable run will be above ground, should the route through the steps, just be at a convenient position?

Many thanks for any advice.