There seems to be a bit of a struggle going on in the EV sector. So-called smart chargers are required if customers want to avail of the OZEV grant which is at a the paltry sum of £350. It looks like many manufacturers have gone the GPRS route using OCPP while others are connecting to the internet via the customers own internet connection. Is this a VHS v Betamax type thing? Which do you think is best?
Last time I lokoed I think we were mostly pretty much against them.like a 2/9 average vote (I picked 9 rather than 10 to make a 5 a sat on fence type idea)
Last time I lokoed I think we were mostly pretty much against them.like a 2/9 average vote (I picked 9 rather than 10 to make a 5 a sat on fence type idea)