I have a project where the customer has IT power distribution system (AC) - Normally in the pre-commissioning procedure I would add a requirement to check the Zs for each piece of equipment based on the trip curve and type of MCB on the incomer to the equipment (TN-x systems) ; However when I was thinking about this ....
Is there any benefit / is it possible to perform Zs measurement on IT distribution? My gut says there is no requirement / benefit, but my brain is nagging I'm missing something.
Views??