Hello everyone!
I am just asking about the following
- The wiring regulations for the installation
- The needed inspection, tests and maintenance
for both three phase and single phase installation
Thanks
Hello everyone!
I am just asking about the following
- The wiring regulations for the installation
- The needed inspection, tests and maintenance
for both three phase and single phase installation
Thanks
Are you talking about smart metering within an installation, or about an energy supplier replacing an existing meter with a smart meter.
If it's the latter, then:
Are you talking about smart metering within an installation, or about an energy supplier replacing an existing meter with a smart meter.
If it's the latter, then:
replacing existed meter to a new smart energy meter