Wind versus Coal

An interesting little side piece in E+T.  It will require 233  5 MW wind turbines to replace one 500 MW coal fired power station. This will occupy 55 square mile. This is also assuming quite a high capacity factor of nearly 43% but I will keep to the quoted numbers.

 

I am not sure if it is viable /sensible to build new coal fired power stations. The Chinese and the Indians certainly think that it is. So to look at the nuclear option:

To replace a 3 MW nuclear power plant with 2 EPR units, Hinkley point C or Sizewell C, will require 330 square miles to be filled with wind turbines (maybe more depending on the wake effect).

www.wind-energy-the-facts.org/wake-effect.html

This is more than twice the area of the Isle of Wight, not impossible but politically very difficult.

The more important question is the resources required. It is difficult to find numbers for the concrete and steel requirements for wind turbines. I do understand that this is affected by the ground conditions and foundation requirements however some number exist in this 2011 document.

pubs.usgs.gov/.../sir2011-5036.pdf

Table 5, page 12,  gives 100 tonnes of steel per MW and 400 tonnes of concrete per MW.  So to replace Hinkley Point C will, according to Kurt Cobb, require 6990 MW of wind turbines.

Steel 6990 * 100 tonnes  = 699 000 tonnes

Concrete 6990 * 400 tonnes = 2 796 000 tonnes.

The quoted figures for Hinkley Point C are:

Steel 280 000 tonnes

Concrete 3 000 000 tonnes.

https://www.newcivilengineer.com/innovative-thinking/projects-innovation-drives-hinkley-point-c-16-01-2019/

https://chamberuk.com/chrisfayers/

So similar amounts of concrete and a lot less steel for Hinkley Point C. The NPP has an expected life span of 80 years, wind seems to be typically 20-25 years.

Hinkley Point C could also use a lot less materials, cost less and be on time if it was built somewhere other than the UK:

www.spectator.co.uk/.../

Is wind power a sensible use of our finite resources?

Parents
  • Wind, Solar, Wave/Tidal and Hydro are all well and good as alternatives to Coal, Gas Deisel and Nuclear but the renawables only work when there power source is in play.  Eg Turbines with no wind do not run the National grid.  The other thing to consider is the lack of redundancy.  As a casing point the Porth Wen Solar Farm in the north Anglesey which is owned by EDF Renewables had it's output reduced after storm Darragh.  Other factors to consider are or should be why we buy in power from abroad? 

    Renewalables on the National Grid need to be backed up by very large battery storage sites also connected to the grid this would allow us to store a certain amount of the energy on lets say a windy day to be used on a calm or windless night.  The battery storage would also allow for the turbines to be constantly working rather than what sometimes happens is they are turned off from generation as too much power at that time is being generated.  The same ethos applies to large scale solar PV farms

    People also need to look beyond the GreenWash for the lack of another word or cliche.  Yes the UK has reduced the amount of coal fired power stations but is real terms all that has happened is coal fired power has been replaced for gas powered

    What needs to happen in the UK is that Engineers need to drive the UK power policy not politicians.  The UK government needs to set up a department for energy that has more engineers working in there than administrators or politicians. 

  • Other factors to consider are or should be why we buy in power from abroad? 

    International connections do seem to be proving useful in balancing wind power - while a good sized high pressure system can occasionally  be large enough to becalm much of the UK at the same time, it's very unusual for them to be large enough to becalm the UK, Ireland, Western Europe and Northern Europe at the same time - so while it's sat over us we can import, and then when it's moved on and becalming someone else we can reciprocate. We already have cables to France, Ireland, the Netherlands, Norway, Belgium and Denmark.

      - Andy.

  • The interlink to France was put in with the channel tunnel and over the last few decades the amount of Mega Watts from France to the UK is a lot higher than what some people might expect.  Conversely how much power have we exported to France, very little.  Then there are the transmission lines from Scotland to England which lack the capacity so there is a limit on how much can be sent from Scotland to England.  The UK are far to reliant on foreign energy, we need to produce our own and store our own and consumer our own

  • Yes the UK has reduced the amount of coal fired power stations but is real terms all that has happened is coal fired power has been replaced for gas powered

    We haven't merely reduced the number of coal fired power stations.  The last one was shut down earlier this year.

Reply
  • Yes the UK has reduced the amount of coal fired power stations but is real terms all that has happened is coal fired power has been replaced for gas powered

    We haven't merely reduced the number of coal fired power stations.  The last one was shut down earlier this year.

Children