Hi Team, for an DC EV Charger Installation, I need to run 1000A DC - 4 Runs of 80m ( for 4 x DC chargers).
Please see my query,
1. Expecting to run +/- together in a conduit as below and 4 conduits for 4 chargers. Is it a good idea?
( +,-).....X.......(+,-).......X.......( +,-).....X.......(+,-).
2. What is the best depth of conduits from a trenching point of view ?
3. What will be the ideal distance (X) between conduits?
4. Do we have any reference standards for DC cables?
This installation is in Australia but DC cable installation method is pretty standard around the world I assume.
Thank you,
Manoj