Hi, under the UK Grid Code, can anyone advise the Requirements for Generators in the UK for "Island Mode" and "Black Start" under the Grid Code? Including the rules about continuing to supply an "island" that becomes disconnected from the grid?
1) Does a power station or other generator etc have to stay operating to supply the island?
2) Can a power station or other generator offer black start, and collaborate with other generators in supplying an island, and later re-sync with grid?
3) Are these functions that can a generator can earn a fee from?
Thanks
Bob Shepherd