As most of you know I’ve only been qualified for just over a year and I’ve got a quote to do for a cu upgrade.


I know I’m nowhere experienced enough to do EICR’s yet, but what would you guys recommend I check/test before doing the cu upgrade and should I do these checks/tests at the quote stage?
Parents
  • Fitzy, this is what you have ostensibly, an old Wylex metalcald consumer unit.

    https://www.youtube.com/watch?v=0L0p5Rk7hZU


    Please pull the main fuse before staring work and get it resealed after you have finished. You do not want to be dismantling a live Henley block, it is very dangerous.


    Also renew the main earth conductor with a length of 16.0mm2 green and yellow. It is easy to do.


    Z.


Reply
  • Fitzy, this is what you have ostensibly, an old Wylex metalcald consumer unit.

    https://www.youtube.com/watch?v=0L0p5Rk7hZU


    Please pull the main fuse before staring work and get it resealed after you have finished. You do not want to be dismantling a live Henley block, it is very dangerous.


    Also renew the main earth conductor with a length of 16.0mm2 green and yellow. It is easy to do.


    Z.