As most of you know I’ve only been qualified for just over a year and I’ve got a quote to do for a cu upgrade.
I know I’m nowhere experienced enough to do EICR’s yet, but what would you guys recommend I check/test before doing the cu upgrade and should I do these checks/tests at the quote stage?
The pipe for this standpipe in the garage is copper tube, along with the stopcock supply under the sink, they don’t know where their water meter is either.
The pipe for this standpipe in the garage is copper tube, along with the stopcock supply under the sink, they don’t know where their water meter is either.