John Peckham:
I have designed quite a few blocks of flats from low rise up to 2 x 40 story modular builds.
How many flats per floor and how many floors. Anything else to be. Supplied such as gym, laundry, shops etc?
John Peckham:
The BNO network is un-metered and it is one of the jobs on the BNO to prevent abstraction by restricting access and locking the Ryfield boards.
The bigger jobs I have designed using bus bars have been supplied straight from a transformer in AWAs to a panel board with MCCBs protecting SWAs to the end feed units on the bus bars. The supply to the landlords bus bar is metered.
John Peckham:
Not in UKPN land since they disowned the un-metered network inside the building.
No metering before the panel board, or on smaller installations a Ryfield board. Just done a design for a small block of flats. Supply head to main isolator to Ryfield to supply 6 flats. and a landlords DB. No meter before Ryfield.
Bigger installs say to 5 blocks of flats supply from transformer to panel board with MCCBs. MCCBs un-metered supply to Ryfields in each block via underground cabling. One supply for tenant's supplies then a separate supply for landlords metered in each block. Separate primary metered supply to LSS MCCB panel in different location.