Hi
I have just had a conversation with a contractor who has stipulated that as part of a vertical cable installation it is a requirement to put a kink in the cable every 5-7m. The reason behind this is they say it helps with the distribution of the weight on high vertical risers.
I have never heard of anyone doing this? can someone please advise me if this is now a requirement, or point me in the right direction for clarification, i.e. is it in any of the guidance notes.
Regards
Desmond Young BSc (Hons) (Open) MSc.