Sparkingchip:
Alcomax:
Sparkingchip:
If the client wants a satisfactory EICR rather than an unsatisfactory EICR with several minor works certificates appended to it why argue?
Wow! Think I need to have a lie down after that bombshell.
Still do the minor works certificates, but of they want to pay for an updated EICR so be it.
I installed a new shower circuit last week from an existing consumer unit , yesterday I did the invoice and certification as one document to email to the regular customer, the document if printed covers eleven sides of A4 paper with an itemised invoice, a copy of the part P notification and the electrical installation certificate.
My notes in my diary for all of this consists of several lines on a page. The customer expects the document to cover eleven pages and that's part of what they pay for. I know it's silly and so do they, but they have all the details my input to the job stored stored as a pdf. on their server as part of their paperless system .
If the customer wants the last document stored on paper in a file or paperless on a server to be a satisfactory condition report and they are paying for it why argue?
Still do the minor works certificates, but of they want to pay for an updated EICR so be it.
Sparkingchip:
Alcomax:
Sparkingchip:
If the client wants a satisfactory EICR rather than an unsatisfactory EICR with several minor works certificates appended to it why argue?
Wow! Think I need to have a lie down after that bombshell.
Still do the minor works certificates, but of they want to pay for an updated EICR so be it.
I installed a new shower circuit last week from an existing consumer unit , yesterday I did the invoice and certification as one document to email to the regular customer, the document if printed covers eleven sides of A4 paper with an itemised invoice, a copy of the part P notification and the electrical installation certificate.
My notes in my diary for all of this consists of several lines on a page. The customer expects the document to cover eleven pages and that's part of what they pay for. I know it's silly and so do they, but they have all the details my input to the job stored stored as a pdf. on their server as part of their paperless system .
If the customer wants the last document stored on paper in a file or paperless on a server to be a satisfactory condition report and they are paying for it why argue?
Still do the minor works certificates, but of they want to pay for an updated EICR so be it.