This discussion is locked.
You cannot post a reply to this discussion. If you have a question start a new discussion

Compliant?

Is this arrangement compliant or not?


Consumer unit. R.C.D. protected shower circuit supplied by a B40 M.C.B. which runs to a cord ceiling switch  in the shower room in 6.0mm2 T&E. Old electric shower removed. New power shower installed with water supplied from tanks. 0.63 Amp transformer in loft to feed new integral shower pump motor. Loft transformer fed via 3 Amp fused switched fused connection unit on a 1.0mm2 T&E cable from old shower ceiling cord switch. 1.0 mm2 T&E run 2.5 metres.


P.S. The switched fused connection unit is at the end of the supply cables.


Confirmation or condemnation by regs. please.


Z.
Parents
  • Yes Andy I was thinking of 434.2.1 (i) and (ii).


    (i) The 1.0mm2 not exceeding 3m in length.


    (ii) "Be installed in such a manner as to reduce the risk of fault to a minimum." The cable is inaccessible as it runs under a tank stand and out of reach or risk of being stood on or mechanically damaged. 


    (iii) Just what requirement is meant here? Run in metal containment perhaps?


    Z.
Reply
  • Yes Andy I was thinking of 434.2.1 (i) and (ii).


    (i) The 1.0mm2 not exceeding 3m in length.


    (ii) "Be installed in such a manner as to reduce the risk of fault to a minimum." The cable is inaccessible as it runs under a tank stand and out of reach or risk of being stood on or mechanically damaged. 


    (iii) Just what requirement is meant here? Run in metal containment perhaps?


    Z.
Children
No Data