Compliant?

Is this arrangement compliant or not?


Consumer unit. R.C.D. protected shower circuit supplied by a B40 M.C.B. which runs to a cord ceiling switch  in the shower room in 6.0mm2 T&E. Old electric shower removed. New power shower installed with water supplied from tanks. 0.63 Amp transformer in loft to feed new integral shower pump motor. Loft transformer fed via 3 Amp fused switched fused connection unit on a 1.0mm2 T&E cable from old shower ceiling cord switch. 1.0 mm2 T&E run 2.5 metres.


P.S. The switched fused connection unit is at the end of the supply cables.


Confirmation or condemnation by regs. please.


Z.
Parents
  • The electric shower has been removed and the cord switch is inaccessible.  What has happened to the cable that used to supply the shower, is it still live, where is it in the wall and how has it been terminated?
Reply
  • The electric shower has been removed and the cord switch is inaccessible.  What has happened to the cable that used to supply the shower, is it still live, where is it in the wall and how has it been terminated?