I saw on the news earlier that this morning they blew up the last of Didcots cooling towers  the demolition went ok but the dust cloud caused a flashover in the substation that is still used to supply parts or maybe a

all of Oxfordshire  I bet the grid engineers were tearing there hair out after last weeks events
Parents
  • It may be only related to the demolition stirring up a  cloud of dust around or settling on the insulators.

    As a side note special dust bombs are made for attacking and disabling open air substations - like rain drops in a thunderstorm, the presence of mixed particulates ,even if individually not very conductive, turns the originally uniform insulation into a series of unequal values capacitors in series, which then break down one by one, until with a sizzle and a pop, the last link is complete. I understand the bombs contain a mixture of graphite powder and sand, and to restart can take days
Reply
  • It may be only related to the demolition stirring up a  cloud of dust around or settling on the insulators.

    As a side note special dust bombs are made for attacking and disabling open air substations - like rain drops in a thunderstorm, the presence of mixed particulates ,even if individually not very conductive, turns the originally uniform insulation into a series of unequal values capacitors in series, which then break down one by one, until with a sizzle and a pop, the last link is complete. I understand the bombs contain a mixture of graphite powder and sand, and to restart can take days