This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

Emergency Power System

Former Community Member
Former Community Member
Say you had a building that needed backup power. Do any British Regs require that the loads be subdivided onto different branches and different automatic transfer switches based on type and priority?








attachments.zip
Parents
  • Former Community Member
    0 Former Community Member
    I see. How would this be typically designed/wired in the UK?
Reply
  • Former Community Member
    0 Former Community Member
    I see. How would this be typically designed/wired in the UK?
Children
No Data