This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

practical need for supp bonding in bathroom

Can anyone suggest a realistic scenario where supplementary bonding would be required in a bathroom or other 701 location? I'm failing to think of one, although I may be overlooking something blindingly obvious.


It can be omitted as long all three of these are satisfied: ADS in time; RCD present; any extr-c-p connected to main bonding.


If ADS can't be done in time by either MCB/RCD then its not legal anyway.

RCD has to be present anyway.

Water and gas pipes etc should already be main bonded if they introduce a potential.
Parents
  • Former Community Member
    0 Former Community Member
    Thank you for pointing out the JW video. I watched it and even endured the mouthwash ad.  He is a very likeable presenter with an affable manner, I will see what else he has on the web.  He cleared that up for me anyway. Many thanks.
Reply
  • Former Community Member
    0 Former Community Member
    Thank you for pointing out the JW video. I watched it and even endured the mouthwash ad.  He is a very likeable presenter with an affable manner, I will see what else he has on the web.  He cleared that up for me anyway. Many thanks.
Children
No Data