I have recommended that the switches have a C.P.C. installed (difficult and disruptive) or be changed to all insulated types.
Just what is the shock risk at these two switch positions? What is the likelihood of the metal plates becoming live due to a fault? Has anyone every seen a metal plate switch break down so that the plates becomes live?
Your issuing of an EICR will have either deemed it satisfactory or unsatisfactory, so is this topic seeking an accomplice if you have already signed to say it is satisfactory?
Regards
BOD
perspicacious:
I have recommended that the switches have a C.P.C. installed (difficult and disruptive) or be changed to all insulated types.
Just what is the shock risk at these two switch positions? What is the likelihood of the metal plates becoming live due to a fault? Has anyone every seen a metal plate switch break down so that the plates becomes live?
Your issuing of an EICR will have either deemed it satisfactory or unsatisfactory, so is this topic seeking an accomplice if you have already signed to say it is satisfactory?
Regards
BOD