Farmboy:
Zoomup:
Thanks all. I was just checking to see if anything had changed after the long discussions about this subject in the past. I intend to place a 100mA S type R.C.D. before a new metal cased consumer unit on a TT earthed installation.
Z.Could the S type not go in the CU as per section 2.2.6 of the OSG?
F
Farmboy:
Zoomup:
Thanks all. I was just checking to see if anything had changed after the long discussions about this subject in the past. I intend to place a 100mA S type R.C.D. before a new metal cased consumer unit on a TT earthed installation.
Z.Could the S type not go in the CU as per section 2.2.6 of the OSG?
F