The maximum permissible disconnection time is 0.4 s in TN system. Why and from where this value (0.4 s) is obtained?

Former Community Member
Former Community Member
The maximum permissible disconnection time in in the event of a short circuit between a phase conductor and a body or protective conductor or a protective-neutral conductor is 0.4 s in TN system. Does anybody know this value (0.4 s) obtains from where? How this value is obtained?
Parents

  • John Peckham:

    . . . I do not know if there is any written requirement to lay rubber matting in front of LV panels . . . 




    It used to be a requirement of the Factories Act. Not sure if it is still in there. Out of curiosity, would anyone trust a piece of rubber matting that had probably not moved since the switchboard was installed? 


    Regards,


    Alan. 

Reply

  • John Peckham:

    . . . I do not know if there is any written requirement to lay rubber matting in front of LV panels . . . 




    It used to be a requirement of the Factories Act. Not sure if it is still in there. Out of curiosity, would anyone trust a piece of rubber matting that had probably not moved since the switchboard was installed? 


    Regards,


    Alan. 