The Western HVDC Link

I did originally answer the previous thread, but have since deleted my response and I believe a new thread with a proper and correct title is the correct way of answering. 


More info on the fault here: https://www.energy-reporters.com/transmission/italys-prysmian-under-fire-over-uk-interconnector-failure/ 


Reports suggest an undersea cable fault in the vicinity of Liverpool Bay. 


Regards,


Alan.
Parents
  • I presume this cable has been laid on top of the Manx cable as well as the other existing electric cables and gas pipes, is there any separation?


    Also presumably it traps a section of the other existing cables on the sea floor and stops them from being lifted for maintenance?


    Andy B.
Reply
  • I presume this cable has been laid on top of the Manx cable as well as the other existing electric cables and gas pipes, is there any separation?


    Also presumably it traps a section of the other existing cables on the sea floor and stops them from being lifted for maintenance?


    Andy B.