We have a block of flats completed in 2017 that have supplies to individual flats in insulated twin and earth.

These cables are fed from a switch fuse and then into a ceiling disappearing into the building fabric.

I no longer carry electrical regs books (Approved sparks but fire specialist) but I did flag up the poor way these cables were installed and questioned if they required a RCD as they were not in metal conduit of armoured cables as I normally see.

Was it not a requirement in a 2015 amendment that all cables such as this were protected/RCD?

Many thanks for taking the time to read.

Paul.
Parents
  • Untidy, so not good workmanship. I would check all the tails screws in each switchfuse, because I bet they are not tight, particularly as the ties were probably added after closing up! What does the EIC say, who is responsible, no reason not to publish it!
Reply
  • Untidy, so not good workmanship. I would check all the tails screws in each switchfuse, because I bet they are not tight, particularly as the ties were probably added after closing up! What does the EIC say, who is responsible, no reason not to publish it!
Children