This discussion is locked.
You cannot post a reply to this discussion. If you have a question start a new discussion

E.V.s queuing for a charge up.

A picture speaks a thousand words....

https://www.dailymail.co.uk/news/article-7755753/Chaos-California-Tesla-drivers-stranded-hours-half-mile-long-line-charge.html


Z.
Parents
  • Presumably the local megapack battery was still flat and the local HV lines not up to charging more than a few at once. Charging 40 cars at once is quite a challenge for an all- electric system.

    It is a very telling detail that they need to install the megpack batteries as a matter of course at the larger sites  to smooth peaks in demand.
Reply
  • Presumably the local megapack battery was still flat and the local HV lines not up to charging more than a few at once. Charging 40 cars at once is quite a challenge for an all- electric system.

    It is a very telling detail that they need to install the megpack batteries as a matter of course at the larger sites  to smooth peaks in demand.
Children
No Data