This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

Mains frequency

Just checked the dynamic demand site and the frequency was down to around49.7 cycles almost down to the lower legal limit never seen that before
Parents

  • mapj1:
    @ DZ I am to be found more or less equidistant  from Southampton and Winchester most of the year..




    I think you need to be a bit more specific - Aberystwyth is more or less equidistant from Southampton and Winchester. I guess you mean between the two.


    I like your comments on the lunar panels, but the installation costs for the moon will be way in excess of the solar ones Clive is commenting on, presumably one of the 'good reasons' it is not off the ground yet - no pun intended.


    Alasdair

Reply

  • mapj1:
    @ DZ I am to be found more or less equidistant  from Southampton and Winchester most of the year..




    I think you need to be a bit more specific - Aberystwyth is more or less equidistant from Southampton and Winchester. I guess you mean between the two.


    I like your comments on the lunar panels, but the installation costs for the moon will be way in excess of the solar ones Clive is commenting on, presumably one of the 'good reasons' it is not off the ground yet - no pun intended.


    Alasdair

Children
No Data