Ruggedscot:
again zero point only valid for resistive loads, but with modern switchmode and inductive capacitative loadings that zero point would be hard and the switching timeframe tiny. sometimes we chase a solution and become blinded by the desire to identify that solution, when the reality is that it could be done simpler and easier through planning the work and having buy in from others. there is no process that can not be interrupted for a short time if all the required planning and adjustments are in place.
Ruggedscot:
again zero point only valid for resistive loads, but with modern switchmode and inductive capacitative loadings that zero point would be hard and the switching timeframe tiny. sometimes we chase a solution and become blinded by the desire to identify that solution, when the reality is that it could be done simpler and easier through planning the work and having buy in from others. there is no process that can not be interrupted for a short time if all the required planning and adjustments are in place.
We're about to take you to the IET registration website. Don't worry though, you'll be sent straight back to the community after completing the registration.
Continue to the IET registration site