Jaymack:
Sorry, I should have have said that there are 8 circuits involved here, not just a lighting circuit for downstairs and another for upstairs, ditto for the 13A sockets. The only reason I can think of behind the irrational mix, was that the cables were simply too short and should have been lengthened; this is a basic departure from the regulations.
I am surprised and saddened, that there some who think that it is OK to have this arrangement on a dual RCD board. There were other departures 1. Loose fitting of a clamp to a water pipe for bonding. 2. No bond at the gas meter. 3. A 32A MCB for a radial circuit to a single, twin socket outlet.
Jaymack:
Sorry, I should have have said that there are 8 circuits involved here, not just a lighting circuit for downstairs and another for upstairs, ditto for the 13A sockets. The only reason I can think of behind the irrational mix, was that the cables were simply too short and should have been lengthened; this is a basic departure from the regulations.
I am surprised and saddened, that there some who think that it is OK to have this arrangement on a dual RCD board. There were other departures 1. Loose fitting of a clamp to a water pipe for bonding. 2. No bond at the gas meter. 3. A 32A MCB for a radial circuit to a single, twin socket outlet.
We're about to take you to the IET registration website. Don't worry though, you'll be sent straight back to the community after completing the registration.
Continue to the IET registration site