Sparkingchip:
I stand looking at installations and end up up with so many questions in my head.
A block of five units presumably with five electrical intakes, now walls have been knocked through and five have become two.
Steel frames, steel cladding, steel roller shutter and steel personnel doors mounted into the other steel work, air conditioning units mounted externally on walls and floor standing on some slabs as
in the photo.
The EV charger has been installed as TT, so presumably the main installation is PME.
Given the location of the rod immediately adjacent to the building and everything else that is going on in the photo was it worth doing so?
Andy B.
Sparkingchip:
I stand looking at installations and end up up with so many questions in my head.
A block of five units presumably with five electrical intakes, now walls have been knocked through and five have become two.
Steel frames, steel cladding, steel roller shutter and steel personnel doors mounted into the other steel work, air conditioning units mounted externally on walls and floor standing on some slabs as
in the photo.
The EV charger has been installed as TT, so presumably the main installation is PME.
Given the location of the rod immediately adjacent to the building and everything else that is going on in the photo was it worth doing so?