Will be fitting a 60A coin meter for a 20/32A supply to greenhouses and thought it safer

to supply the meter from a garage unit rather than come off the mains isolator switch/henly block

with16/25mm tails into the meter and then into the garage unit.The meter is double insulated.Thanks for any advice.

                                                                                          Regards,Hz
Parents
  • The greenhouse will be TT,d locally, supplied by an overhead swa.The supply is tns.This will be a sub meter adjacent to the suppliers meter.

    I was going to fit the meter after the mcb/rcd to avoid an extra switch fuse upstream,but noticed an existing coin meter was wired straight

    from the henley block,which did,nt seem correct.

                                                                Regards,hz
Reply
  • The greenhouse will be TT,d locally, supplied by an overhead swa.The supply is tns.This will be a sub meter adjacent to the suppliers meter.

    I was going to fit the meter after the mcb/rcd to avoid an extra switch fuse upstream,but noticed an existing coin meter was wired straight

    from the henley block,which did,nt seem correct.

                                                                Regards,hz