What testing should be undertaken when replacing a CU?
Should the property have a EICR before the replacement is carried out?

Parents
  • Well then, an EICR is overdue. Much of the inspection and testing will have to be done in the course of installing the new CU, but most of it doesn't have to be done twice. If you have the EIC for the re-wire, so much the better.