Was wondering how to go about putting this together and has to whether there are better ideas.Basically trying to interconnect on different floors with one power cluster to another and at present coming into the first power cluster on the ground floor there are 5 cables each i assume of 25mm2 cables labelled (L1,L2,L3,N & E) now when these are hardwired into the first power cluster would they connect to the RCD of each of the sockets for (110v,230v and 400v) and then these goto power the breakers of the sockets.And to move onto the next Power Cluster on the first floor is a suitable sized cable then connected from the RCD of the first power cluster on the ground floor to the next power cluster on the first floor?.Please help/clarify?.Also to power up a distribution box on the ground floor for the 230v lighting circuit and the office sockets can a 16mm2 cable be hardwired from the ground floor cluster units 32A MCB for 230v socket protection for the power cluster unit.to the distribution unit contained within the office?.Please Clarify?Jimmy
Parents
  • As this is clearly some sort of industrial site, the safety of your fellow workers is paramount and you could be in serious trouble if you tried to follow our advice and something went wrong.

    You really do need to employ a UK trained electrician or electrical engineer..

    However, looking at the Mennekes UK catalogue, it says "MENNEKES receptacle combinations are available tailor made in size and equipment to your individual specification" so you can probably have included whatever you ask for. It would certainly make sense for all the required internal connections to be done in the factory.

    I would be temped to have each one come with a 5m flexible lead of a suitable size and plug and all you need to install on site is a socket in a safe location on a ring main on each floor. That way it can be installed, moved and removed easily.
Reply
  • As this is clearly some sort of industrial site, the safety of your fellow workers is paramount and you could be in serious trouble if you tried to follow our advice and something went wrong.

    You really do need to employ a UK trained electrician or electrical engineer..

    However, looking at the Mennekes UK catalogue, it says "MENNEKES receptacle combinations are available tailor made in size and equipment to your individual specification" so you can probably have included whatever you ask for. It would certainly make sense for all the required internal connections to be done in the factory.

    I would be temped to have each one come with a 5m flexible lead of a suitable size and plug and all you need to install on site is a socket in a safe location on a ring main on each floor. That way it can be installed, moved and removed easily.