Hi All


Slightly convoluted question:


1. A design and build job originally designed to Stage 3 level detail during 17th edition times (2017)


2. Updated by consultant to Stage 4 detail mid 2019, still design and build, but not updated in line with 18th edition (presumably erroneous thinking on the part of the consultant that because the job was to the 17th and the stage 4 was not considered a major redesign from first principles, then it did not need updating)


3. Job being installed now in 2020.


4. Given that the contractor has taken on design responsibility, are they right to try and claim additional costs for redesigning in line with the 18th edition? Or would they be expected to have noted and included for this seeing as they were appointed late 2019? 


I think personally that it would be argued the contractor should have picked this up and flagged in their pricing that they would need to update the design to the 18th.


What do others think?




Parents
  • Not sure I catch your drift Andy - I always see that a consultant is involved in a D and B on client side to provide a base performance design. Guess dependant on the job.


    Of course the problem arises from said performance design being produced on the cheap with little effort - so little assistance or narrative is provided to a tenderer.


    Then of course let's not give anyone sufficient time to understand and price it properly and see what a good hassle free job we get.

Reply
  • Not sure I catch your drift Andy - I always see that a consultant is involved in a D and B on client side to provide a base performance design. Guess dependant on the job.


    Of course the problem arises from said performance design being produced on the cheap with little effort - so little assistance or narrative is provided to a tenderer.


    Then of course let's not give anyone sufficient time to understand and price it properly and see what a good hassle free job we get.