This discussion is locked.
You cannot post a reply to this discussion. If you have a question start a new discussion

Any Pointers on electrical layout for a fabrication rig

Former Community Member
Former Community Member


Trying to find the best approach to this problem has the cable trays between the sockets of the units will not cater for large cables above 25mm2 so was looking at having to change the design from a looping cabling system between Main sockets on each floor there are 4 floors in total on the rig to each Power Cluster.So that each Power Cluster have there own Power Supply cable going to them individually so we can look at cutting down the size of cabling to fit the cable trays.But to do this i'm after some electrical layout ideas from the Forum.The starting point of the electrical layout are 3 125A Sockets (ie.400v,230v & 115v) which have an interconnection at two ends (ie Left Side and Right Side) so there is a need for a change-over switch.Then from there on looking at adding a large distribution box for the individual cables to connect to the various sockets of the Power Cluster.

Jimmy2Rivers
Parents
  • Temporary structure does not mean it has to be plugs and sockets, and it looks like you need more juice than just a 125A socket can supply.and much above that it gets very awkward to move very quickly, so we tend to use singles  like these rather than multicore cables. Carrying more than a few metres of 35mm2 HOR 7 extension lead  like this and you will do yourself an injury. We'd pay out off from  a landrover or similar for a 25m length.

    It may be worth browsing The sort of things that get hired for outdoor events - you may see these back stage at a festival or on a building site.   There is a wide range of ready made cable and connection options.

    The words 'Gas and oil' are potentially alarming - are you supposed to be ATEX compliant ?



    PS, while I am linking to a commercial website, I have no connection, exceot as a happy customer..

Reply
  • Temporary structure does not mean it has to be plugs and sockets, and it looks like you need more juice than just a 125A socket can supply.and much above that it gets very awkward to move very quickly, so we tend to use singles  like these rather than multicore cables. Carrying more than a few metres of 35mm2 HOR 7 extension lead  like this and you will do yourself an injury. We'd pay out off from  a landrover or similar for a 25m length.

    It may be worth browsing The sort of things that get hired for outdoor events - you may see these back stage at a festival or on a building site.   There is a wide range of ready made cable and connection options.

    The words 'Gas and oil' are potentially alarming - are you supposed to be ATEX compliant ?



    PS, while I am linking to a commercial website, I have no connection, exceot as a happy customer..

Children
No Data