Hi all, my father in law has a rental property that was completely rewired and with new split load CU five years ago. The installation is now due an inspection. Will the fact that the CU is plastic constitute a "fail"?
The IET is carrying out some important updates between 17-30 April and all of our websites will be view only. For more information, read this Announcement
davezawadi (David Stone):
514.14.1 explicitly allows red and black to remain on previously installed cables, to earlier editions. Thus these do not require to be changed, although there should be a notice (no notice = C3).
Only if there are mixed colours - 514.14.1
davezawadi (David Stone):
514.14.1 explicitly allows red and black to remain on previously installed cables, to earlier editions. Thus these do not require to be changed, although there should be a notice (no notice = C3).
Only if there are mixed colours - 514.14.1