lyledunn:
You are correct Alan, the last house is next door at the end of line about 150m away from the house in question. On the line running left on my sketch the first section is overhead to a pole where it feeds another TT property. At the same pole the cable goes below ground and feeds 3 more domestic properties on a run of about 500m to the last.
How many of the three further properties are TN-C-S? Is it likely that after at least 650 m, Ze could be < 0.35Ω?
lyledunn:
You are correct Alan, the last house is next door at the end of line about 150m away from the house in question. On the line running left on my sketch the first section is overhead to a pole where it feeds another TT property. At the same pole the cable goes below ground and feeds 3 more domestic properties on a run of about 500m to the last.
How many of the three further properties are TN-C-S? Is it likely that after at least 650 m, Ze could be < 0.35Ω?