This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

PRS SECONDS AWAY ROUND 2

I had an email today from one of my network of contractors concerning a refusal by a letting agent accepting an EIC for the purposes of satisfying the requirements for PRS.


The installation is new in May this year and the contractor has issued an EIC for 10 years. The letting agent has refused the EIC and wants an EICR to satisfy the requirements for letting and the PRS .


My observations are.


1. We teach inspecting and testing students that an EICR is a "report" and not a certificate.

2. We teach inspecting and testing students that an EIC is a "certificate" and not a "report".

3. The PRS legislation requires a "report" from a qualified  person. No mention of a certificate.

4. The duration of the required report is 5 years.

5. The average letting agent will normaly accept any old bit of paper from one of their tame contractors written on the back of a bus ticket in crayon by a knuckle scraping half wit.


So what does the forum think, was the letting agent right to refuse an EIC and only accept an EICR?


Parents
  • Despite you writing the reason for producing the report as being for a landlords safety inspection or the like and the report being quite dated.


    Andy B
Reply
  • Despite you writing the reason for producing the report as being for a landlords safety inspection or the like and the report being quite dated.


    Andy B
Children
No Data