Relocation of kitchen so let etc

Former Community Member
Former Community Member
Hi all was wondering what you all do when asked to relocate sockets during a kitchen refit, specifically where you have made a joint in an existing 2G backbox which is no longer going to be used?


Do you just fit a blanking plate over, let the tiler tile over or terminate in wago connectors and let the plaster bury the joint?


Regards Ts
Parents
  • So in years to come when a kitchen fitter drills through that capping and through those cables, that no one knew were there, its ok because there is RCD protection? Capping is protection from plasterers trowel and containment, a drill will blast through that. Not really an acceptable way to leave it in my opinion, pictures or not
Reply
  • So in years to come when a kitchen fitter drills through that capping and through those cables, that no one knew were there, its ok because there is RCD protection? Capping is protection from plasterers trowel and containment, a drill will blast through that. Not really an acceptable way to leave it in my opinion, pictures or not