This discussion is locked.
You cannot post a reply to this discussion. If you have a question start a new discussion

Are RCD's Required?

Hi, looking to understand if an RCD would be a required regulation (and/or just highly recommended) in the following situation.  The additional cost of installing four or five 3-Phase RCDs is quite substantial and I would prefer to avoid it if still deemed as safe and not legally required.  Earthing system is TN-C-S.


For connecting up 4x Immersion Elements (9kW, 9kW, 6kW, 3kW) in Brewery Tanks I am looking at either:


A.  SWA Cable clipped direct to basket from the Control Panel to IP rated Plugs/Sockets mounted on the wall.  Then floating SY Cable (recommended by electrician) from the wall to the Tanks, which is about a 2m run.  Thinking Plugs/Sockets just to make life easy if I ever want to move things around and also for easier access for cleaning.


B.  Same as above but swapping the Plugs/Sockets for Isolators.


Look forward to your feedback and opinions.  Cheers.
Parents
  • John Peckham:

    My advice to you is to get a good design engineer to design the installation for you and then get a competent electrical contractor to do the installation.


    Trying to get advice on this forum is one thing but it is no substitute for having a robust compliant design!


    I couldn't agree more. We seem to be going round in circles. The notion of having an RCD, but no OCPD in the circuit is a bit worrying.


Reply
  • John Peckham:

    My advice to you is to get a good design engineer to design the installation for you and then get a competent electrical contractor to do the installation.


    Trying to get advice on this forum is one thing but it is no substitute for having a robust compliant design!


    I couldn't agree more. We seem to be going round in circles. The notion of having an RCD, but no OCPD in the circuit is a bit worrying.


Children
No Data