Chris Pearson:
I have a couple of SRCDs. The manufacturer's instructions say that the product should be removed from the circuit prior to insulation resistance testing. That's fine if you have only one in a ring, it's on a spur, or is at the end of a radial circuit, but a bit of a problem otherwise.
You've got to ask whether that's fit for purpose in a BS 7671 installation at the present time ... but perhaps an indicator of the way things will change in future.
Chris Pearson:
I have a couple of SRCDs. The manufacturer's instructions say that the product should be removed from the circuit prior to insulation resistance testing. That's fine if you have only one in a ring, it's on a spur, or is at the end of a radial circuit, but a bit of a problem otherwise.
You've got to ask whether that's fit for purpose in a BS 7671 installation at the present time ... but perhaps an indicator of the way things will change in future.
We're about to take you to the IET registration website. Don't worry though, you'll be sent straight back to the community after completing the registration.
Continue to the IET registration site