Allowances on when the 18th Edition must be applied.

Can I ask what are the rules of when the 18th must be applied over the 17th edition. I note in the front of the Regs it mentions the date 31st December 2018. However I’m looking at a scheme where the consultant performance specification was written in 2017 which has been revised a number of times in 2019 and 2020 and now a detailed design is required ready for install. The performance specification mentions the 17th edition all the way through it so what are the rules on this? Surely just because this has been sat on a shelf for a period of time the 17th edition must now be replaced with the 18th edition? I’m presuming there is a time window for this and I don’t know if to complete the design and install it as per the 17th if I would be breaking it.  
Parents
  • Technically a performance design has been undertaken back in 2017 and now all that's needed is to progress the design by adding more detail. But technically should this be inline with the 17th. 


    As it is we will ensure its 18th edition compliant but it's an interesting question. If a consultant has undertaken a performance level of design back in 2017 which has then sat on a shelf for a few years then when the design is progressed under a D&B contract should the design meet 18th regulation or the 17th which is stated throughout the contract information.
Reply
  • Technically a performance design has been undertaken back in 2017 and now all that's needed is to progress the design by adding more detail. But technically should this be inline with the 17th. 


    As it is we will ensure its 18th edition compliant but it's an interesting question. If a consultant has undertaken a performance level of design back in 2017 which has then sat on a shelf for a few years then when the design is progressed under a D&B contract should the design meet 18th regulation or the 17th which is stated throughout the contract information.