Chris Pearson:
were you doing an EICR, it would be C3.
On the whole, I think better for the structural integrity of the house to leave it where it is; but if you are feeling energetic, you could drill some holes (1/2"?) through all the joists and re-site it.
Hi Chris, it would be an unusual code for the majority of EICRs limitations do not include lifting all floorboards to inspect cable routing!
BTW, are you using a bit and brace to drill holes?
Chris Pearson:
were you doing an EICR, it would be C3.
On the whole, I think better for the structural integrity of the house to leave it where it is; but if you are feeling energetic, you could drill some holes (1/2"?) through all the joists and re-site it.
Hi Chris, it would be an unusual code for the majority of EICRs limitations do not include lifting all floorboards to inspect cable routing!
BTW, are you using a bit and brace to drill holes?