This discussion is locked.
You cannot post a reply to this discussion. If you have a question start a new discussion

EICR Remedial Work

Former Community Member
Former Community Member
Hi, my first post, I wondered if I could get some advice from the community regarding a failed EICR report and the subsequent remedial works.

Me letting agent appointed a local electrical firm to conduct an EICR report on my flat before new tenants moved in. The timescale was tight since the new tenants were due to move in on the 1st Feb.


The flat is a purpose-built flat constructed in 2005 so id be surprised if the electrics were too far out of spec.


The report came back as failed due to the following points:


1 No Bonding, substantial metal pipework in property

8 Fan is not low voltage in bathroom, and is in zone 2


the quotation for the remedial work was to install 100mm bonding from the consumer unit to the stop cock and replace the extractor with an extra low voltage fan and controller.

"estimate of a morning for 2 which hopefully will be less, however the route is not particularly easy" - £630 inc VAT.


the quote sounded high for a mornings work but due to time constraints i had to agree.


the final invoice came back as 28 hours work, £1399...  so that's 28 hours work to run about 6metres of earth bonding and replace the bathroom fan when the initial quote was a morning's work for £630.


So obviously I've questioned this and after doing some digging, I found that firstly 230v fans are allowed in zone 2, and not all incoming water pipes need to be bonded if there is plastic in the incoming supply..


I'll upload screenshots of the paper work and photos of the job, but any advice would be greatly appreciated!

fef58217ef06411ab3fcb5e012db7a01-huge-quotation.png



b2dc16ff7b1f285e61c95ea8dd664268-huge-eicr-report.png


Parents
  • Former Community Member
    0 Former Community Member
    davezawadi (David Stone):

    Ok Joe. Please email me as above, you need some facts which I will give you free. All part of the service here, but I suggest not for publication because your contractor can look too, which may not help you. The photo above went wrong somewhere.


    Regards

    David


    ive emailed you the report and quote, thanks for your help :)

     


Reply
  • Former Community Member
    0 Former Community Member
    davezawadi (David Stone):

    Ok Joe. Please email me as above, you need some facts which I will give you free. All part of the service here, but I suggest not for publication because your contractor can look too, which may not help you. The photo above went wrong somewhere.


    Regards

    David


    ive emailed you the report and quote, thanks for your help :)

     


Children
No Data