DNO connection

ce84021977c12a7ea512033714ca0b1f-huge-69d11d65-e54a-4553-b351-5a8d1daf4e4b.jpg
Parents
  • Former Community Member
    0 Former Community Member
    It makes me wonder why the DNOs do not put in an earth rod (or tape or mat) every time that they make a junction. It would not cost much.


    I believe that it has been WPD's policy for about 5 years now and they have a standard length of solid copper wire about 1.5 m long that looks as if it has been Thermit welded to a rod. It is made off in the joint and as Lyle's image shows, laid horizontally in all the joint jobs I've seen.


    Regards


    BOD
Reply
  • Former Community Member
    0 Former Community Member
    It makes me wonder why the DNOs do not put in an earth rod (or tape or mat) every time that they make a junction. It would not cost much.


    I believe that it has been WPD's policy for about 5 years now and they have a standard length of solid copper wire about 1.5 m long that looks as if it has been Thermit welded to a rod. It is made off in the joint and as Lyle's image shows, laid horizontally in all the joint jobs I've seen.


    Regards


    BOD