This discussion has been locked.
You can no longer post new replies to this discussion. If you have a question you can start a new discussion

RCD connection unit, have I missed something?

da5744ca6495fb2d5e2d7fa34848db93-huge-20210518_103641.jpg

When and why?


Incidentally the property has and always has had a 30 mA RCD main switch in the consumer unit.
Parents
  • You get the feeling some project manager at the RCD factory was not keen to pay for a new set of plastic  mould tools to be cut, so the cheap thing was done and the sliders just withdrawn on the one they already had that was originally used for the RCD socket version.

    Or if its really cheap then made with the holes and filled in afterwards. I imagine on the back you can see the filling sprues . If you are really lucky the distortion of the front from flat will reveal the section thickness as well.

    Good mould makers charge 20-50k per mould to compensate for those sort of errors  for a good reason.

    M.

Reply
  • You get the feeling some project manager at the RCD factory was not keen to pay for a new set of plastic  mould tools to be cut, so the cheap thing was done and the sliders just withdrawn on the one they already had that was originally used for the RCD socket version.

    Or if its really cheap then made with the holes and filled in afterwards. I imagine on the back you can see the filling sprues . If you are really lucky the distortion of the front from flat will reveal the section thickness as well.

    Good mould makers charge 20-50k per mould to compensate for those sort of errors  for a good reason.

    M.

Children
No Data