dcbwhaley:
And you shall be told. :-)
The sheathing has been cut short by about 20mm and the coloured insulation is visible. No copper is visible and there is not room to get a dcb-standard finger into the knockout
So it is a C2 for exposed single insulation and another C2 because there is not a grommet.
The outcome is the same utter regardless of if it's a C1 or C2. I cannot see anything that is creating work that is not required, I cannot see that the inspector is trying to rip up off, you are just being pedantic.
dcbwhaley:
And you shall be told. :-)
The sheathing has been cut short by about 20mm and the coloured insulation is visible. No copper is visible and there is not room to get a dcb-standard finger into the knockout
So it is a C2 for exposed single insulation and another C2 because there is not a grommet.
The outcome is the same utter regardless of if it's a C1 or C2. I cannot see anything that is creating work that is not required, I cannot see that the inspector is trying to rip up off, you are just being pedantic.
We're about to take you to the IET registration website. Don't worry though, you'll be sent straight back to the community after completing the registration.
Continue to the IET registration site