wallywombat:
It boils down to whether you think cables could end up dangling down to head height before the suspended ceiling itself collapsed.
Agreed - it's a bit like the argument about letting cables rest on the ceiling grid and whether the grid is capable of taking the weight. A small T&E at a few grams per metre isn't likely to be an issue, a bunch of several 50mm² 3-core armoureds might be a bit different.
Most of the suspended grids I've seen have been held up with steel wires from all-steel knock-in fixings in the concrete (or directly from the structural steelwork) so itself unlikely to be prone to premature collapse just to fire I would have thought.
- Andy.
wallywombat:
It boils down to whether you think cables could end up dangling down to head height before the suspended ceiling itself collapsed.
Agreed - it's a bit like the argument about letting cables rest on the ceiling grid and whether the grid is capable of taking the weight. A small T&E at a few grams per metre isn't likely to be an issue, a bunch of several 50mm² 3-core armoureds might be a bit different.
Most of the suspended grids I've seen have been held up with steel wires from all-steel knock-in fixings in the concrete (or directly from the structural steelwork) so itself unlikely to be prone to premature collapse just to fire I would have thought.
- Andy.