Zoomup:Chris Pearson:
Let's not even talk about looping at the switch. Now then, what do we have? Loop in and loop out to the next room; loop to shaver socket; 3C&E to fan; switch drop to light switch; supply to luminaire. That's 6 CPCs, which won't fit in the back-box terminal, and the neutrals so a couple of Wagos. You need a back-box the size of a bucket!
Interesting use of lever Wago connectors! I don't think that you are supposed to put 2 wires in one hole.
Zoomup:Chris Pearson:
Let's not even talk about looping at the switch. Now then, what do we have? Loop in and loop out to the next room; loop to shaver socket; 3C&E to fan; switch drop to light switch; supply to luminaire. That's 6 CPCs, which won't fit in the back-box terminal, and the neutrals so a couple of Wagos. You need a back-box the size of a bucket!
Interesting use of lever Wago connectors! I don't think that you are supposed to put 2 wires in one hole.
We're about to take you to the IET registration website. Don't worry though, you'll be sent straight back to the community after completing the registration.
Continue to the IET registration site