This discussion is locked.
You cannot post a reply to this discussion. If you have a question start a new discussion

Shower circuit design.

Why would an electrician install a 10 mm twin and earth circuit protected by a B32 MCB for a 8.5 kW shower?

Parents
  • Back to basics,  the first thing to do in a circuit design calculation is to determine the design current Ib. 

    3e5f10665c98585b6abb68aef846e453-original-20210801_112223.jpg

     

    As set out in the IET Design Guide. 

Reply
  • Back to basics,  the first thing to do in a circuit design calculation is to determine the design current Ib. 

    3e5f10665c98585b6abb68aef846e453-original-20210801_112223.jpg

     

    As set out in the IET Design Guide. 

Children
No Data